MANILA, Philippines — The Metropolitan Manila Development Authority (MMDA) has proposed the construction of rainwater impounding facilities inside Camp Aguinaldo to ease recurring flooding along EDSA, with the proposed design released on Wednesday.
The plan calls for detention ponds that will temporarily store excess rainwater during downpours and gradually release it into the EDSA drainage system leading to Makiling Creek.
MMDA unveils plan to build rainwater impounding facilities in Camp Aguinaldo
According to the proposal, the project will be implemented in three phases covering 182 hectares: a golf course near Gate 2, another near Gates 3 and 4, and an open space near Gate 6.
For the first phase near Gate 2, the detention pond has a 361-meter perimeter, a 4,650-square-meter area, an 8-meter depth, and a 37,200-cubic-meter capacity, designed for a 25-year return period (15.6 mm/hr over 24 hours) and exceeding the needed 36,945 cubic meters., This news data comes from:http://www.erlvyiwan.com

MMDA’s schematic shows that under normal weather, water bypasses the pond and traverses the lagoon to EDSA; during heavy rains, floodgates divert flows into the pond; after rains, pumps discharge stored water slowly to EDSA toward Makiling Creek.
MMDA unveils plan to build rainwater impounding facilities in Camp Aguinaldo
The scope of work covers the impounding area, an operations and power house, drainage and electromechanical works, and landscaping and golf course restoration, with a treatment facility under consideration.
Officials said operations and maintenance arrangements and a memorandum of agreement were being discussed..
- Gaps in healthcare services remain - study
- The rot goes deep: Marcos decries decades-old corruption
- Lone bettor wins P86M in 6/42 lotto draw for Sept 6
- PH to host seafarers’ welfare forum
- House justice panel to probe US' extradition request for Quiboloy
- May 12 poll results accurate, credible - OCTA Research
- Globe partners with unconnected.org to provide remote schools with sustainable internet connectivity
- Palace suspends govt work, classes in several areas due to bad weather
- House tackles P881B public works budget amid flood control anomalies
- Rep. Tiangco reveals P17B flood control allocations linked to former appropriations chairman Rep. Zaldy Co